Before service can be installed, the following conditions need to be met:
- The construction site and building foundation must be back-filled to within 3" of final grade.
- The service route is to be cleared 10' wide of brush, etc.
- The gas meter location must be clearly marked.
- Easements need to be signed and on file with MGU.
- All service construction charges are to be paid in advance.